Skip to product information

Tuya Zigbee USB Power Adaptor

Tuya Zigbee USB Power Adaptor

Regular price $32.99 USD
Regular price $32.99 USD Sale price $32.99 USD
SAVE 0% Sold out

The Tuya Zigbee USB Smart Switch is a compact and versatile device that enables wireless control of your USB-powered gadgets. Compatible with Tuya Zigbee hubs and apps, it offers seamless remote control, voice command support, and customizable scheduling—perfect for automating your home or office devices without the hassle of wiring. Designed for broad compatibility, it lets you manage single adapters or create groups for unified control, simplifying your smart home experience. With reliable Zigbee connectivity ensuring stable performance across various setups, this smart switch provides a flexible and dependable solution for efficient power management in any environment.

 

An error has occured. Please try again.

check_circle Secure checkout

check_circle 30-day returns

Tuya Zigbee USB Power Adaptor - SyncYourHome, Compatible with all USB Adapters and Cables

Tuya Zigbee USB Power Adaptor

Regular price $32.99
Regular price $32.99 Sale price $32.99
SAVE 0% Sold out
local_shipping

Get it between - and -.

Name: Micro USB Adapter
Communication method: Zigbee 3.0
Highly concerned Chemicals: None
Origin: Mainland China
Compatibility: All Compatible
Certification: CE
Certification: RoHS
Model Number: Zigbee 3 USB Adaptor
Style: 1 USB / 2 USB / 3 USB
Input: 5V-12V
Output: 5V-12V-2.5A
Working Temperature: 0°C~40°C
Material: PC V0
Size: 31*26*43mm

View full details
Tuya Zigbee USB Power Adaptor - SyncYourHome, Pocket Sized

Compact & Portable Design


The Tuya Zigbee USB Smart Switch features a mini-sized, lightweight body that fits seamlessly into any space. Its portable design makes it easy to move and install wherever you need smart control without adding bulk or clutter.

Tuya Zigbee USB Power Adaptor - SyncYourHome, App Remote Control

App Remote Control


Control your USB-powered devices from anywhere using the free Smart Life or TuyaSmart app on your smartphone or tablet. Whether you’re at home, at work, or on the go, you can turn devices on or off, set schedules, and monitor usage effortlessly.

Tuya Zigbee USB Power Adaptor - SyncYourHome, Group Control Function

Group Control


Combine multiple USB smart switches into a single group for synchronized control. Turn all connected devices on or off with one tap, making your smart home system more efficient and unified.

Tuya Zigbee USB Power Adaptor - SyncYourHome, Offline Notification

Offline Notifications


Receive real-time alerts in the app if the smart switch goes offline or loses connection. This helps ensure continuous monitoring and quick troubleshooting for uninterrupted automation.

 
 

Questions? Ask & get a reply within 24 h.